summaryrefslogtreecommitdiff
path: root/chapter29/docs/deferred-construction.md
Commit message (Collapse)AuthorAgeFilesLines
* Graphics now allow resizemainCliff Click7 hours1-0/+5
| | | | | | Reorganize docs. Fix bugs X86 LOad+cmp scheduling. Math intrinsics
* Cleanup public escapesCliff Click9 days1-0/+5
| | | | | | Drop "frozen" public escapes, and recompute in Start/Stop so Opto gets a precise escape set. Rename XInt.free -> XInt.alloc Fix some String tests to not escape by default
* Remove a bunch of extra graph walks pre-Optoch29-cleanupCliff Click10 days1-0/+380
Removed most; moved a few into Opto setup pass. Lots of modest bug fixes